#105 Evaluation of the TOE Summary Specification
Date:  17 October 2003

Interim Statement:

The CCIMB agrees that there are some inconsistencies between the Part 3 criteria for ASE/APE and the Part 1 Annex material describing the contents of the ST and PP. A resolution to these inconsistencies will be included in the ASE/APE rewrite.

 

In the meantime, the use of this national interpretation will not impact recognition of results based on that interpretation, as far as can be determined in the abscense of methodology.

.